Comments

Friday 3 April 2015

ESTIMATED PRICE LIST INVENTORY IN CHILDREN LEARNING CENTER - YPKGM FOUNDATION at Leupung

For those who are interested to support the Foundation at Children's Learning Center in Leupung, might want to know the condition of the foundation of wealth in greater detail so that an accurate overview of the foundation and can determine how they will support this foundation. Here I attach a link that can be downloaded to get the file list price of the foundation of wealth. (click Here) Can I explain here that these assets do not include assets of the foundation in its branches in the region, such as in Sabang (Iboih), Pidie, Pidie Jaya which has had a permanent building and land endowments / grant given society. Price building 1 size 8.5 x 12 m (2 floors) reached Rp. 900 million because the building is prepared to 3 floors so that from the beginning of its foundation has created a model that supports the chicken claw 3-storey building, as well as slippers hanging on the 2nd floor has also been prepared to accommodate the 3rd floor so that the time for the development of the 3rd floor will require an overhaul again While the second building was originally the size of 4 x 8 m which is the BRR for building the library, and then fit the needs of the building was expanded again to be 12 x 9 m. For land already has SHM but still proprietary Teuku Syafrizal because this is his inheritance only so to waive the cost of replacement is necessary because if not then teuku Syafrizal will not have the slightest ground for the whole of his work during this life has been submitted to the foundation , Likewise, the construction of buildings 1 and 2, into using his funds (Juliani), namely marriage and dowry money from selling the land in the village pond, so if it is not returned then automatically they do not have any property to be passed on to their grandchildren. But of course this is not something that should be done but it is important to know that someday your involvement in the Foundation either as a participant or as a supervisor or supervisors, when the availability of funds has allowed it would not arise misperceptions if later performed the transfer of such rights.

0 komentar:

Post a Comment

SHARETHIS

Share artikel ke: Facebook Twitter Google+ Linkedin Technorati Digg